Construction cost index for road construction

To the Top
The 3 steps are Choose table, Choose variable and Show result. You are currently at Choose variables

08663: Cost index for maintenance of roads (1st quarter 2004=100) 2000K1 - 2023K4

Polina Bulygina, Statistics Norway
+47 408 11 472
Hanne Beate Høiby, Statistics Norway
+47 408 11 428
2024-01-22 08:00
Cost index:
index
Change from previous quarter (per cent):
per cent
Change from previous year (per cent):
per cent
Cost index:
Middle of each quarter
Change from previous quarter (per cent):
Middle of each quarter
Change from previous year (per cent):
Middle of each quarter
Cost index:
1 quarter 2004=100
Change from previous quarter (per cent):
1 quarter 2004=100
Change from previous year (per cent):
1 quarter 2004=100
Statistics Norway
External PROD
Now you have come to the page, Choose variable. This page give you the oportunity to select which variables and values you want to display in your result of the table. A variable is a property of a statistical unit. The page is divided into several boxes, one for each variable, where you can select values by click to highlight one or more values. It always starts with the statistics variable which is the main value counted in the table.
Navigating with keyboard and screenreader. Select multiple object in row: SHIFT+arrow down/up. To select a single value in the listbox: Windows:Hold Ctrl + arrow down. Then release Ctrl and press space. Repeat. Mac:CMD+arrow down/up. Then release CMD and press spacebar. Repeat. (Works only in Chrome, not in Safari). To exit listbox with values selected, press TAB-key.
Mandatory

Selected 1 of total 3

Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.2000K1 , 2000K2 , 2000K3 ,

Selected 1 of total 96

Mandatory

Selected 0 of total 8

Number of selected data cells are:
(maximum number allowed is 300 000)
Number of selected cells exceeds the maximum allowed 300 000