Property management, local government

To the Top
The 3 steps are Choose table, Choose variable and Show result. You are currently at Choose variables

12049: Operating expenditures for selected county municipalities buildings, by type and function (C) 2015 - 2023

Jens Mathiesen, Statistics Norway
+47 40 81 13 98
2024-03-15 08:00
Sum (NOK 1000):
NOK 1000
Expenditures per square metres (NOK):
NOK
Sum (NOK 1000):
31.12
Expenditures per square metres (NOK):
31.12
Statistics Norway
External PROD
Now you have come to the page, Choose variable. This page give you the oportunity to select which variables and values you want to display in your result of the table. A variable is a property of a statistical unit. The page is divided into several boxes, one for each variable, where you can select values by click to highlight one or more values. It always starts with the statistics variable which is the main value counted in the table.
Navigating with keyboard and screenreader. Select multiple object in row: SHIFT+arrow down/up. To select a single value in the listbox: Windows:Hold Ctrl + arrow down. Then release Ctrl and press space. Repeat. Mac:CMD+arrow down/up. Then release CMD and press spacebar. Repeat. (Works only in Chrome, not in Safari). To exit listbox with values selected, press TAB-key.

Selected 1 of total 2

Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.2015 , 2016 , 2017 ,

Selected 1 of total 9

Selected 0 of total 5

Selected 0 of total 3

Optional variable
Number of selected data cells are:
(maximum number allowed is 300 000)
Number of selected cells exceeds the maximum allowed 300 000
Property management costs for selected owned county municipalities’ buildings

region

See list over changes in regional classifications (in Norwegian).

Tables that use the new regional division also for the years before 2024.

contents

Sum (NOK 1000)

From 2017 on, Oslo accounts most of the expenditures concerning roads on function 332 Municipality roads.

Expenditures per square metres (NOK)

The only relevant combination with this variable is the type corrected gross expenditures together combined with the different builidings.