Content
Published:
This is an archived release.
1 per cent increase in construction
Total labour costs per hour in construction increased by 1.0 per cent from the fourth quarter of 2009 to the first quarter of 2010. In the same period in 2009, costs increased by 0.7 per cent.
The labour cost index for manufacturing had a growth of 0.9 per cent in the first quarter of 2010.
The statistics from this quarter are based on a new classification of industry . |
For more tables, see Statbank.
Tables:
Contact
-
Thomas Hagen
E-mail: thomas.hagen@ssb.no
tel.: (+47) 40 81 13 20
-
Heidi Bekkevold Backe
E-mail: heidi.backe@ssb.no
tel.: (+47) 40 81 13 22
-
Marianne Mellem
E-mail: mnm@ssb.no
tel.: (+47) 40 81 14 42