Transport and communication, Norwegian National Rail Administration - StatRes
Transport and communication, Norwegian National Rail Administration – StatRes comprise this enterprise as an administrator of the railway infrastructure, as operational manger of trains and as route assigner.
Input
Data from the accounts and the number of man-years carried out, are presented here. The accounting figures referred to, are in accordance with the periodical annual account. Norwegian National Rail Administration is involved in a pilot project in developing such an account for public enterprises.
2006
2007
2008
Operating expenditures (mill. NOK)
3 429,9
3 813,7
4 112,7
- Personnel costs (mill. NOK)
1 603,1
1 661,1
1 789,1
- Acquisition of goods (mill. NOK)
1 225,7
1 532,5
1 477,4
- Depreciation (mill. NOK)
601,1
620,1
846,2
Capital/assets (mill. NOK)
22 807,1
25 068,0
29 101,3
Investments (mill. NOK)
2 272,1
2 846,6
3 091,9
Contracted man-years adjusted for long term leaves
2 822
2 802
2 865
Activities and services
Basic data about the rail infrastructure is presented below. For example the kilometres of main track, double track, electrified track and the number of level crossings. The figures are presented by line.
2006
2007
2008
Main lines (kms)
4 114
4 114
4 114
- With regular traffic (kms)
3 887
3 887
3 887
- Double track (kms)
227
227
227
- Electrified (kms)
2 552
2 552
2 552
Level crossings
3 979
3 761
3 687
Crossings with barriers, lights and klaxons
..
350
375
Stations with passenger traffic
357
357
357
Choose line
line
Outcomes
The state of the infrastructure is presented here as percentage of double track, level crossings with light and barriers and so on. Figures for railway accidents, punctuality and regularity are also published. More than half of the figures are presented by line. Additionaly, punctuality figures are also specified by type of train, while figures comprising regularity are shown by type of train only.
2006
2007
2008
Electrified line (per cent)
62
62
62
Percentage double track (per cent)
6
6
6
Level crossings per kilometres line
1,0
0,9
0,9
Uptime (per cent)
..
98,8
98,5
Punctuality, freight train (per cent)
77,0
77,0
77,0
Interruptions due to defects in signalling system per kms track
..
0,3
0,3
Interruptions due to feeder station faultage per kilometres line
..
...
...
Killed
1
2
1
Average number of killed last 20 years
7,25
7,0
6,7
Seriously injured
3
3
1
Animal fatalities
1 567
1 885
1 877
Number of moose killed
714
942
954
Choose line
line
Choose line
line
Choose type of train
type of train
Related indicators
Figures for the railway production are presented here. These figures are based on data from the transport operators and are published separately by Statistics Norway (Rail transport statistics).